![](https://www.skylineconstruction.build/wp-content/uploads/2022/10/Lusk-7.jpg)
Project
DETAILS
This conversion of 2 office buildings to lab space for Heathpeak Properties required new mechanical infrastructure, a specialty power system, water feeds, lab casework, and lab sinks. The second floor offices were converted into a lab-office speculative suite, creating 5,000 sq. ft. of lab space and 11,000 sq. ft. of office space and a conference room. In addition to the lab space, the project included: a new building entry, an upgraded lobby, new service elevator installation, outdoor amenities, and a fitness area. The outdoor amenities consisted of a meeting area and a kitchen. Between the 2 buildings is a lush courtyard lined with several seating areas. Trees, patio umbrellas, and a custom steel and wood trellis offer shade, creating an oasis to which tenants can retreat throughout the day. A new aluminum entry canopy wraps around the glass doorway, leading to the lobby. An open staircase hovers over a bed of pebble rocks, creating a focal point within the space.
GALLERY
DREAM TEAM
COLLABORATORS
![](https://www.skylineconstruction.build/wp-content/uploads/2022/10/Health-Peak.png)
![](https://www.skylineconstruction.build/wp-content/uploads/2022/10/PMA_logo_trans_background_Logo.jpg)
![](https://www.skylineconstruction.build/wp-content/uploads/2022/10/Ferguson-Pape.jpg)
![](https://www.skylineconstruction.build/wp-content/uploads/2022/10/civil-Snipes-Dye-Associates.png)
![](https://www.skylineconstruction.build/wp-content/uploads/2022/10/MPE-logo-new-600x146-1.jpg)
![bullet](/wp-content/themes/beaverwarrior/assets/img/bullet-point.png)
![bullet](/wp-content/themes/beaverwarrior/assets/img/bullet-point.png)
![bullet](/wp-content/themes/beaverwarrior/assets/img/bullet-point.png)
![bullet](/wp-content/themes/beaverwarrior/assets/img/bullet-point.png)