Skip to content

Introducing

McKesson

Healthcare giant, McKesson completed an 8-floor, phased restack in an occupied space.

PROJECT

DETAILS

McKesson offers award winning healthcare systems, professional services, medical equipment and pharmaceutical distribution. Skyline is proud to have been McKesson’s preferred general contractor in San Francisco since 2010. This multi-floor, phased restack project included the construction of new conference rooms, huddle and break rooms, open offices, restroom upgrades, kitchen, and the installation of a demountable partition system. Skyline was brought on early in the design process to provide budget pricing for each drawing issuance while identifying cost-saving measures and coordinating with outside vendors for IT, security and AV. Precautions were taken during the day to not disturb occupants of the building. The project is LEED CI Gold and WELL Silver certified.

PROOF IS IN THE NUMBERS

CHECK OUT THESE KEY STATS

bullet-point

150K

Sq. Ft.

bullet-point

8

Floors

bullet-point

10+ years

As a Preferred Partner

Spotlight

FEATURES

Every project is fully customized to satisfy the specific needs of our client’s business. Here are a few features that make this space especially unique.

LEED Certified

This project is LEED Gold Certified and Well Certified

Occupied Space

Special care was taken to ensure the employees were well set up in their swing space and were undisturbed by the on-going construction

MEP & FLS Upgrades

During the phased restack every floor received all new MEP, FLS and lighting systems

DREAM TEAM

Collaborators

bulletBayline bulletDe Anza Tile bulletHoem bulletJerry Thompson & Sons bulletPribuss Engineering bulletRMR bulletCutting Edge Drapery bulletInnovative Mechanical bulletMcMillan bulletDemo Masters bulletPremium Glass bulletVCB Acoustics