![](https://www.skylineconstruction.build/wp-content/uploads/2022/10/AGI-4.jpg)
Project
DETAILS
Office tenant improvement on the 29th, 30th and 32nd floors of 600 W Broadway in Downtown San Diego. The project consisted of 10 continuous phases in a fully occupied space. DIRTT's integrated prefabricated walls were used throughout the office, and the conference room was partitioned with modern, movable walls.
Photo
GALLERY
DREAM TEAM
COLLABORATORS
![](https://www.skylineconstruction.build/wp-content/uploads/2022/10/Allianz-Global.png)
![](https://www.skylineconstruction.build/wp-content/uploads/2022/10/Ann-Sneed.png)
![bullet](/wp-content/themes/beaverwarrior/assets/img/bullet-point.png)