
PROJECT
DETAILS
Projects have been completed in California, Seattle and Chicago for this fast growing tech firm. Skyline gave the San Francisco offi ce a fresh look by assisting the team through several design iterations, offering value engineering, cost saving solutions and a design/build electrical system. Their extensive Chicago build-out featured Artemide light fixtures imported from Italy, turf ceiling baffl es and twenty-five different custom wall coverings. The space includes an open floor plan, multiple collaboration spaces, two kitchenettes and a wellness room.
PROOF IS IN THE NUMBERS
CHECK OUT THESE KEY STATS
$9 M
VALUE OF PROJECTS
55,000
SQ. FT. BUILT
3
PROJECTS COMPLETED
3
Different Cities
4
Years Working Together
GALLERY
DREAM TEAM
Collaborators




