Skip to content

Introducing

Catalent Clinical Supply

Building repositioning conversion from a former bakery to a cGMP Manufacturing facility.

PROJECT

DETAILS

Demolition to shell and new construction to multiple areas of the building. The full scope included GMP manufacturing and packaging, laboratories, storage and cold storage areas, and administrative office space. Our project delivery utilized MEP design assist and BIM modeling for early procurement and schedule fast tracking. With a complex, load-bearing structural component supporting the lab space, the overhead ducts provide higher quality air filtration for clean rooms.

Spotlight

FEATURES

Every project is fully customized to satisfy the specific needs of our client’s business. Here are a few features that make this space especially unique.

Stability Chamber

The stability chamber provides a controlled temperature and humidity environment

3 ISO 8 Sampling Dispensing Rooms

The 3 ISO 8 sampling dispensing rooms maintain a maximum particle count of 100,000 particles per cubic ft. of air

DREAM TEAM

Collaborators

bulletPacific Rim Mechanical bulletIckler Electric bulletH&R Steel bullet