1125 Mission St

Building repositioning at 1125 Mission St.

PROJECT

DETAILS

This 36,000 sq. ft. building repositioning included extensive hard and soft demolition, grading & shearing of walls, design/build electrical systems, a brand new elevator, and drilling 75-foot micropiles into the ground.

Our team helped guide the client through the complex process, including scheduling issues due to design changes and unforeseen building conditions. In addition, we provided value engineering, cost-saving alternatives, and design/build services. This project also involved the installation of an underground PG&E transformer vault.

Spotlight

FEATURES

Every project is fully customized to satisfy the specific needs of our client’s business. Here are a few features that make this space especially unique.

Demolition

The project included hard and soft demolition

Interconnecting Staircase

Staircase built between the ground floor and 2nd floor

Elevator

New elevators were installed

PG&E Transformer Vault

An underground PG&E transformer vault was installed