1125 Mission Street

Building repositioning at 1125 Mission St.

Project

DETAILS

This 36,000 sq. ft. building repositioning included extensive hard and soft demolition, grading and shearing of walls, design/build electrical systems, a brand-new elevator, and drilling 75-foot micropiles into the ground.
Our team helped guide the client through the complex process, including scheduling issues due to design changes and unforeseen building conditions. In addition, we provided value engineering, cost-saving alternatives, and design/build services. This project also involved the installation of an underground PG&E transformer vault.
Our team helped guide the client through the complex process, including scheduling issues due to design changes and unforeseen building conditions. In addition, we provided value engineering, cost-saving alternatives, and design/build services. This project also involved the installation of an underground PG&E transformer vault.

PROOF IS IN THE NUMBERS

CHECK OUT THESE KEY STATS

bullet-point

36K

Sq. Ft. Built

bullet-point

75

Ft. Micropiles Drilled Into Ground

bullet-point

3

Floors

Spotlight

FEATURES

Every project is fully customized to satisfy the specific needs of our client’s business. Here are a few features that make this space especially unique.

Demolition

The project included hard and soft demolition

Interconnecting Staircase

Staircase built between the ground floor and 2nd floor

Elevator

New elevators were installed

PG&E Transformer Vault

An underground PG&E transformer vault was installed