Project
DETAILS
Skyline Construction is converting a 336,000 sq. ft. industrial shell into a high-performance manufacturing and R&D hub, featuring 40-foot demising walls, a helicopter mechanical pick, and precision installation of 45 injection molding machines. With major power and cooling upgrades, integrated systems, and modular construction, the project delivers cleanroom-ready environments, operational flexibility, and $13M in value-engineered savings.
PROOF IS IN THE NUMBERS
CHECK OUT THESE KEY STATS
8
megawatts of power
800
tons of cooling
45
Injection Molding Machines
40'
Demising Walls
100
emitters for Humidification System
$13M
Cost Savings