Phased demolition of two old Kewanee Steam Boilers and installation of new, more efficient, Cleaver Brooks Steam Boilers capable of being converted to hot water in the future. The project also included the installation of a Camus Steam Conversion Hot Water Boiler to allow floors with VAV’s to access hot water right away. The other major aspect of this project included installation of a new hot water riser throughout the building on both the California Street side of the building and the Sacramento Street side of the building.
Project Duration: 45 weeks
Project Engineer: Randall Lamb